Ensure all personnel who operate or maintain the boiler room are properly trained on all equipment controls safety devices and up to date operating procedures.
Boiler room door requirements uk.
Must have perforated dob plans and boiler manuals on site at t time of inspection.
The boiler and wh located there and room b is the open basement space.
Plans must show boiler make model heat input.
This means the door to the cabinet should be openable and there should be a minimum gap of 700 mm between the boiler and a wall or other obstruction for the engineer to service it properly.
All fire door components furniture and aesthetic components which penetrate the surface of the door or wrap around the door from one side to the other must be fire rated.
There is a variety of other boiler design concepts available.
Lets say input rating of your boiler is 110 000 btu and your wh is 40 000 btu total rating in room a is 150 000 btu.
It s more important that the flue is situated in the right position with correct ventilation.
These boilers are frequently used when floor area is quite limited and where sufficient height in the boiler room is available.
Chimney location material size 7.
Note that a closer can only be omitted if the door has a lock and is intended to be locked at all times such as a cleaner s cupboard server room etc.
For example cast iron sectional boilers usually limited to smaller output capacities.
Fresh air location and size.
Now you need to find the required volume.
Therefore keep the boiler room clean and clear of all unnecessary items.
Boiler room door swing emergency switch.
Phone 08456 448802 fax 08456 448803 info mhgheating co uk www mhgheating co uk 01 12 16 2 room sealed appliances installed within a boiler room heated space natural ventilation requirements direct to outside air system type grille location 600m from any obstruction heating or hws operation 50 during summer months heating or hws.
There are vertical boilers see figure 1 7 of several designs.
Knowledge is powerful as are boilers.